Advertisement

Table of Contents
  • Entrapment protection

    7
  • LOOP

    8
  • H-8-08 Page

    9
  • Instructions regarding intended installation

    10
  • Slide gate requirements

    12
  • Slide gate protection

    13
  • See page

    17
  • Concrete Pad

    18
  • Operator Installation

    19
  • Chain Installation

    20
  • Front Mount Installation

    21
  • Warning Sign Installation

    23
  • Conduit Requirements

    25
  • High Voltage Connections

    26
  • Control Wiring

    27
  • Loop Detector Wiring

    28
  • Auxiliary Device Wiring

    29
  • Primary / Secondary (Bi-parting) Gate Wiring

    30
  • Terminal Identification and Description 2.6.1 Main Terminal (P1)

    31
  • Secondary Device Terminal

    32
  • Circuit Board Adjustments

    33
  • Switch Settings

    34
  • Programming Switch Description and Function

    35
  • Limit Switch Adjustment

    36
  • Reverse Sensitivity Adjustment

    37
  • Power and Reset Switches

    39
  • Resetting a Soft Shutdown

    40
  • Hard Shutdown

    41
  • Fail-Safe Manual Operation

    42
  • Fail-Secure Manual Operation

    43
  • Maintenance Schedule

    45
  • Operator Diagnostics

    46
  • Trouble Shooting

    47
  • Accessories

    49

Related manuals